Mar 23, 2026, 08:14 PM
[IMG width="578px" size="474x175"]https://external-content.duckduckgo.com/iu/?u=https%3A%2F%2Ftse1.mm.bing.net%2Fth%2Fid%2FOIP.G_UaJhsGVxwllpyzhKD7OAHaCv%3Fpid%3DApi&f=1&ipt=c83f3398fe8745a8f95c6fe34d9f7048be7d2a3e589ccafb40337ce7cdc4186c[/IMG]
Site: mohsl.gov.lk
Date: 03/13/2026
Price: 50$
Contact: telegram or qTox: 551F318036E4A7E3274DC79B9D5D0B7D61DC1964BFF1ECF3F94B26B3B2D4185827F80AA1F0F9
Dump contain site information, data admin login and documents.
Site: mohsl.gov.lk
Date: 03/13/2026
Price: 50$
Contact: telegram or qTox: 551F318036E4A7E3274DC79B9D5D0B7D61DC1964BFF1ECF3F94B26B3B2D4185827F80AA1F0F9
Dump contain site information, data admin login and documents.
"sample #1" Spoiler
id,type_id,project_category_id,project_sub_category_id,notes,map_url,pd_name,employer,pd_email,language,consultant,contractor,pd_contact,contract_no,description,project_name,commence_date,estimate_cost,scope_of_work,source_of_fund,completion_date,project_duration
17,1,1,16,<blank>,<blank>,Mrs. H.G.N. Premakanthi,Road Development Authority,[email protected],3,Not yet selected,MAGA Engineering (Pvt) Ltd – Phase 1,Mobile : +94-76-7131805 Direct No. : +94-342212021 General No.: +94-34-2258266,"RDA/GOSL/REP/LCB/P01, P02, P03, P04","Development of a high mobility road network that connects all parts of the country so that a reasonable average speed can be maintained for travel between any District pair is a prerequisite for economic and social development. Expansion of the existing expressway network in a systematic manner to cover the entire country with minimum network length and identify & improve other main roads to complete the balance of the network is necessity to achieve the above objectives. \r\n\r\nConsidering the existing and committed expressway network and the present travel times between different parts of the country, it appears that connecting Ratnapura and Badulla Districts to Western and Southern Provinces with high mobility links is a priority. In this context, possibility of an expressway link to connect Ratnapura District was studied and found to be feasible for the near future.",Ruwanpura Expressway Project,03.05.2021,Rs. 54.7Bn,<blank>,Local Bank,01.11.2023,30 months
18,1,2,18,Civil work 100% completed.,<blank>,S.H. Jayasinghe,Road Development Authority,[email protected],3,Abuljebain Engineering & Consulting Office (AECO) with Sub Consultant Infotech Ideas (PVT)Ltd - Terminated,KD Ebert and Sons Holdings and BMG Joint Venture,Mobile : 0718244169 Office : 011-2862690,RDA/SPMU/KFAED/CW-PK 01,"Reconstruction of 8 bridges in Western, Sabaragamuwa, Southern and Eastern provinces.",Reconstruction of 25 Bridges Project (GOSL - Kuwait) – Package 1,07th September 2015,<blank>,"Reconstruction weak and narrow bridges to suit, present traffic volume.",Kuwait Fund for Arab Economic Development (KFAED),19th June 2020,4 yrs (with EOT)
19,1,2,19,<blank>,<blank>,Eng. W.K. Kodithuwakku,Road Development Authority,[email protected],3,MG Consultants (Pvt) Ltd,MAGA Engineering (Pvt) Ltd,011-2884047,RDA/SRCP/ICB/ADB/CP-2,"The Project from 13+800Km to 23+400Km B084 [Kesbewa to Pokunuwita] Road and 17+260 to 18+200Km A004 [Panagoda] Road commenced on 17 November 2016. \r\nTotal road Length divided to 5 sections as follows;\r\nSection 1 - from 13+800Km to 16+520Km, B084 Road - 0.72Km\r\nSection 2 - from 16+520Km to 18+600Km, B084 Road -2.08Km\r\nSection 3 - from 18+600Km to 21+800Km, B084 Road - 3.20Km\r\nSection 4A - from 21+800Km to 23+400Km, B084 Road - 1.60Km\r\nSection 5 - from 17+260Km to 18+200Km, B084 Road - 0.94Km",B084(South) Road Section from Kesbewa to Pokunuwita (From 13+800Km to 28+180Km) and A004 Road Section from Kirulapona to Godagama (From 00+130Km to 01+000Km and 15+360Km to 16+280),17 November 2016,"Rs. 3,374,456,137.43",<blank>,Asian Development Bank Fund [100% Foreign component],16 May 2019,910 Days [30 months]
20,1,2,19,<blank>,<blank>,W.K.Kodithuwakku,Road Development Authority,srcppd@gmailcom,3,MG Consultant,Olympus Construction,011-2884047,RDA/SRCP/NCB/ADB/CP-04,Southern road connectivity project ADB loan no 3027 Rehabilitation and Improvement of Ambathale тАУ Cinec Junction Road Section from Km 0+000 to Km 1+850.,Improvement and Rehabilitation of Ambatale - Cinec Junction Road,05 July 2017,Rs. 224024396.85,<blank>,ADB Fund,01 April 2018 (Extention Date - 03 Nov 2018),"Days 270 , Exention Days 216 - Total Days 486"